So many aspects of our lives are going to change over the next twenty years. And one that’s easily in the top five is the question: “What do you do at work all day?”

Two massive breakthroughs are on the cusp of happening around this question. The first one is agentic automation: “describe a task that we currently do, and automate it.” The second one is employee empowerment to take initiative. People closest to the problem can increasingly investigate and take action on opportunities without waiting for information and authority to travel through layers of hierarchy.

Both of these things are radical changes – for the better! – to what everyone does all day. IF, and this is a big if – organizations are actually able to evolve into this new way of working. A shockingly large component of “what is someone’s day to day job” is constrained by the system of record and decision-making used by their employer. And this in itself is constrained by the database technology they use, and what it makes possible. Not many people think about this second part.

Enter Databricks. Outside of people in their sphere of influence (who know them very well), Databricks might be the most under the radar story in Silicon Valley, even though they’ve now surpassed a $7 billion run rate, growing 80% y/y. You’ve certainly heard of them, but not that many people actually know what Databricks does, other than being 1) a data company, and 2) important for agents, although perhaps not sure why.

The Databricks story is a wild sequence of events, and a serendipitous example of a product whose time has come. Three years ago, every interaction on Databricks involved a human. Today, the company is seeing more queries from agents than people, and more than 17 million databases are launched by agents every day. This trend will continue.

There are four parts to this story:

1) What does Databricks actually do? What is a “Lakehouse” and a “Lakebase”, those words you may have seen on billboards, and why are they an architectural breakthrough that arrived just in time?

2) What is a “system of record”, and why do agents need a new kind of SoR if they’re gonna work inside real companies, make real decisions, and contribute to the company’s knowledge base?

3) What is a firm in the first place? How does that change, if agents outnumber people 1000:1? How do firms differentiate themselves, and create value?

4) What are people’s jobs all day, in this new world? The promise of AI at work is often advertised as, “Ordinary people now have software engineer powers.” But the long-term impact isn’t necessarily “everyone is an engineer.” It might be closer to, “Everyone is a manager.”

This is, perhaps, the highest-stakes piece of all. We’re witnessing in real time the great undoing of the management style that built the 20th century, as chronicled in James Burnham’s famous work The Managerial Revolution. Eighty five years ago, Burnham described how information technology and organizational complexity was creating a corporate operating model, where a small class of professional managers centralized the decision-making inside of companies. Today, thanks to a new wave of technology, the craft practitioners at the front lines are regaining responsibility again – and we’re all better for it.

This is Databricks, and why it will power the future of the firm.

From Spark to Agents

Databricks has recently been described as “a data company that caught the AI wave.” But the company was built by AI researchers a decade before the wave arrived. The business is four technology S-curves stacked over nearly two decades – Spark, Lakehouse, Lakebase, and now agents – each of which created the innovation window for the next. To properly appreciate this sequence of unlocking potential, we have to take a minute and talk about database technology.

In 2009, Ali Ghodsi was a visiting researcher at UC Berkeley watching internet companies use enormous datasets to predict what people would click, buy, and watch. This was a time when people talked about “Big Data” a lot. The leading framework was Hadoop, which companies like Yahoo, Facebook, Twitter, and LinkedIn used to process data workloads in parallel across thousands of cheap, commodity servers. Before Hadoop, the standard way to process larger workloads was to buy a bigger machine from vendors like Oracle or IBM that cost millions of dollars each, so Hadoop was an attractive alternative.

Hadoop’s critical flaw was that each round of a computation saved its results to disk before the next could begin. That made work easier to recover when one of the cluster’s cheap machines failed, which was a sensible choice. But it was painfully slow for iterative workloads like machine learning, where you make predictions, measure the error, update a model, and then repeat. Hadoop treated each round as a new job and reloaded the same data from disk every time, so the cluster spent minutes moving data for every few seconds of improving the model.

This problem inspired Matei Zaharia, a PhD student at Berkeley, to write the first version of Apache Spark. Spark built on Hadoop’s innovation of spreading data processing work across cheap machines, but let applications keep frequently reused data in the servers’ much faster memory between rounds instead of loading it from disk each time – without giving up fault tolerance. That made these repetitive workloads up to ten times faster. The lab open-sourced it in 2010, and three years later, Ali, Matei, and five of their fellow researchers founded Databricks to abstract away the complexity of running the distributed infrastructure Spark required – the clusters, the scaling, the security – behind a single platform for the enterprise.

Spark sped up data processing, but where that data lived was another problem. Enterprise data in that era occupied two separate worlds. Data warehouses held the structured, trustworthy records that let analysts ask questions of them in SQL and powered every dashboard and quarterly report. Data lakes provided cheap storage for everything else, like documents, images, recordings, and logs. Data lakes were cheap, so teams dumped everything into them; but nothing was checked or structured on the way in. Even though a vast ecosystem of AI open-source tools like TensorFlow and PyTorch grew around the data lake, it was hard to get value from a pile of data you couldn’t trust, which earned them the nickname “data swamps.”

Both systems solved a problem, but they created a divide. Engineers and data scientists lived in the lake with Python while analysts lived in the warehouse with SQL. Whenever one side needed the other’s data, someone had to build a pipeline to move it. This left the company with lots of copies, pipelines, permissions, and conflicting definitions. But in the late 2010s, Databricks, Uber, and Netflix each landed on the same fix independently. Their projects (Delta Lake, Hudi, and Iceberg) added a table layer over the files in the lake, giving them warehouse-like guarantees such as all-or-nothing updates, schema management, and versioned history. Instead of moving the data into a separate warehouse for reliability and performance, a company could now run warehouse-style workloads on the same storage where the data already lived. It was the breakthrough that made a new architecture possible.

In 2020, Databricks invented the “lakehouse” by merging the data lake and the data warehouse. It combined the cheap, flexible storage of the data lake with the strict reliability and fast query performance of a data warehouse, then made warehouse-grade SQL and machine learning first-class workloads on the same foundation. The cheap storage that held everything became trustworthy enough to serve as the data foundation that engineers, data scientists, and data analysts could finally share. “The best data warehouse is a lakehouse,” went the tagline, and customers seemed to agree. Today, Databricks’ Lakehouse runs at a more than $1.5 billion revenue run-rate, growing over 100% year over year.

Amazon CTO Werner Vogels made the case from the customer’s side in a January 2020 blog post. “If you wanted to combine all of this data in a traditional data warehouse without a data lake, it would require a lot of data preparation and export, transform, and load (ETL),” he explains. “You would have to make trade-offs on what to lose and continually change the structure of a rigid system.” Data lakes let you import data in any format, eliminating these trade-offs. The lake was also a powerful foundation for machine learning and AI, which, Vogels wrote, “thrive on large, diverse datasets.”

One divide remained. The lakehouse unified the data a company analyzes, but not the data its applications run on. The operational database, which manages real-time transactions for day-to-day business operations, like processing payments or user logins, was still stitched to the lakehouse by a web of fragile pipelines. Compute and storage remained bundled in one monolithic box, and data was trapped in proprietary formats that made migrations one of the scariest technical projects in any organization.

So in 2025, Databricks bought Neon, a serverless Postgres company whose databases were already being created mostly by AI agents, and which represented a new architectural category of databases, called lakebase (inspiring Databricks to call the resulting product that integrated Neon into Databricks “Lakebase”). Just as the lakehouse rebuilt the warehouse on top of the data lake, Lakebase applies the same idea to the operational database. It separates storage from compute so data can be stored cheaply in the data lake while compute scales up or down with demand. And because operational databases and the lakehouse share the same underlying storage, database changes automatically become available to analysts, engineers, and agents, without a web of pipelines to build and maintain. Databricks calls this unification of transactions and analytics LTAP, for Lake Transaction/Analytical Processing.

This separation makes the database behave more like code. Even petabyte-scale databases can be duplicated in seconds because Lakebase only copies the changes. This lets an agent create an isolated branch, experiment on it, and throw it away when it’s done – a consideration even Databricks didn’t fully appreciate until recently. Lakebase launched last year and has already crossed a $100 million revenue run rate, and agents are its most prolific users. “We think that is probably going to be a bigger market in the long run than the existing database market,” Ali says.

This technological unlock has come just in time. For decades, software in a company was built by a small group of engineers and used by everyone else. We are moving to a world where a person declares the outcome they want and the software figures out how to achieve it. Instead of thousands of employees reading and writing from a handful of databases managed by a central team, the company will have thousands of databases that millions of agents read and write to.

A System of Record for Agents

Databricks CEO Ali Ghodsi on stage at the company’s Data + AI Summit 2026 (Photo: Databricks)

In June, Ali stood in front of ~30,000 people at the company’s Data + AI Summit and asked the room to raise their hands if artificial general intelligence had arrived. He counted maybe ten percent.

“We believe AGI is already here,” he told them, pointing out that today’s frontier models can already solve more than half the questions on Humanity’s Last Exam – 2,500 questions, written by experts in more than a hundred fields, believed to be too hard for any AI to answer.

When ChatGPT came out in 2022, it could handle coding tasks that take a person about thirty seconds. Today’s frontier agents complete coding tasks that take a skilled engineer a full work day. Researchers at METR, an independent evaluation lab, have tracked the length of a task an agent can finish on its own across models going back to 2019, and it has doubled roughly every seven months. Recently, progress has been even faster, with similar trends beyond coding. If it holds through the early 2030s, agents will be capable of doing tasks that would take a human years.

Yet, inside most companies today, AI still isn’t trusted to reliably update records in Salesforce.

“AI does not have an intelligence problem,” Ali explains. “It has a context problem.” Even the smartest human would be all but useless without access to the company’s data, permission to act, feedback, or the knowledge in other employees’ heads. Ali’s answer is what he calls a “system of record for agents.”

Maybe you’ve seen a clip of Palantir CEO Alex Karp talking about ontology. “All of the value in the market is going to go to chips and what we call ontology,” he posits. “The ontology allows you to take an LLM, use it, refine it, and impose it on your enterprise.” What that means in practice is usually left as an exercise for the listener.

Every company has an ontology – a working model of what exists, how those things relate, what its words mean, and which source governs when two disagree. Parts of it live in databases, dashboards, policies, and documents. But much of it lives only in the heads of experienced employees. It’s also never finished. Contracts change, workarounds become processes, exceptions become rules, and the official record drifts away from how the work is actually done. The same is true of who decides what and of remembering which decisions were right – authority and evaluation are just as unwritten as ontology. People compensate for all of it almost invisibly. It’s the job of the VP of Sales to know that the biggest committed deal has stalled because the champion is quietly interviewing elsewhere, that one rep’s “90%” really means 50% – and to cut the forecast before it reaches the CEO.

For agents to act autonomously, much of the ontology, authority, and evaluation that currently lives in people’s heads will have to move into the firm’s system of record. Databricks is betting the lakehouse is the natural home for it because that’s where the rest of the company’s data is stored and governed. “The lakehouse has become the system of record nowadays,” Ali says. “I call it SORA – the System of Record for Agents.”

Employees can interact with this system of record through Genie, the natural-language interface Databricks launched in 2024 that lets anyone in the company ask questions of its data and, increasingly, build agents on top of it. Underneath, the record has to span the whole firm and continuously answer four questions, each of which Databricks is working on:

What is true? Lakehouse and Lakebase already hold the state.

What does it mean? Instead of letting AI loop through all the data in a company hunting for answers every time someone asks a question, Databricks’ Genie Ontology continuously builds a graph of what the organization knows, like how revenue is calculated or what was discussed in the transcript of last week’s standup. An algorithm the engineers dubbed OntoRank (a nod to Google’s PageRank) ranks which knowledge is authoritative by weighing attributes like who created a definition, how widely it’s used, and how recently it changed. In Databricks’ testing, grounding an agent in the company’s ontology raised the accuracy of answers from about 50% to 84.5%.

What is allowed? The old access model of a login for every employee held up when every worker was human, but it breaks when employees are spinning up hundreds of agents a day. “You can’t grant access to each proprietary, siloed database to your agents,” Ali explains. Databricks’ Unity Gateway gives every model, agent, and AI tool in the company an identity, a budget, and guardrails, and traces log every action so the company can see what its AI systems are doing, what data they access, and how much they cost.

Did it work? Databricks gives companies two ways to build agents. Business teams build theirs in Genie, turning a prompt into a shareable agent that reasons over the company’s data and, increasingly, takes action in applications like Slack or Salesforce. Engineers build more customized agents in Agent Bricks, Databricks’ developer platform for production AI agents. Either way, Databricks lets teams write their own exams – the acceptable results and the mistakes that cannot be made – and gives them tools to optimize each agent against the company’s definition of good for a given task, which is how AI becomes a loop.

Every platform shift in enterprise computing has created a new fight over the system of record. IBM dominated the mainframe era. Oracle and SAP became foundations of the client-server enterprise, while Salesforce, Workday, and ServiceNow built the SaaS systems of record for sales, HR, and IT. Agents are the next shift.

But which vendor wins is a smaller question than how agents will change the firm itself.

The Nature of the Firm

In his 1937 article “The Nature of the Firm,” economist Ronald Coase asked why firms exist at all. If markets can coordinate activity through prices and contracts, why bring people together inside companies and subject their work to managerial direction?

His answer came down to transaction costs. Finding the right person, negotiating what needs to be done at what price, and monitoring it all take time and money. A firm replaces some of those repeated market transactions with a more open-ended arrangement in which managers direct resources within agreed limits. But organizing work inside a firm is not free either. As a company grows, more information has to travel through more people, and eventually, the cost of organizing the next transaction internally costs as much as buying it from the market. In Coase’s account, the firm expands until those two costs meet.

Forty years later, Herbert Simon – one of the few people to win both the Nobel Prize and the Turing Award – observed that centralizing the memory of a business decentralized its decisions. A shared computer record, he wrote, “allows each of the decentralized decision points to take actions independently” because the system automatically reconciles those actions against the shared record.

For an airline, a ticket agent in Boston didn’t have to call every other ticket agent before selling the last seat to Chicago. She consulted the record, and when she sold the seat, the record changed for everyone. Centralized state made decentralized action safer because people could coordinate with the record instead of with each other.

The relational database extended this principle across the company. Work that once required reports, meetings, and managerial handoffs became a query against the shared record, which let the company coordinate more products, locations, people, and transactions without adding management at the same rate. By the 1990s, the internet let the outside world write to the firm’s record, and an online marketplace could coordinate buyers, sellers, inventory, and payments among millions of strangers.

Because both external and internal transaction costs fell, the database era did not make firms uniformly larger or smaller. Instead, it allowed a wider range of firms to exist. Large firms became capable of managing far more complexity, while small firms could rent or buy capabilities that once required entire departments.

The same is likely to be true of AI. Inside the firm, agents can reduce coordination costs by automating reporting, search, and routine tasks. Outside it, they can help find and evaluate vendors, negotiate routine terms, and monitor the results. Like the database before it, AI will raise the complexity ceiling of the businesses and markets that can exist. But its more consequential effect may be how it changes the shape of the firm.

The typical firm of the twentieth century was pyramid-shaped because hierarchy was its information processing system. Facts moved up through reports and meetings, decisions moved back down, and the map of information flow mirrored the org chart. Management decided what data was worth gathering or sharing, which meant the company’s view of itself was only as good as what its managers had chosen to collect.

Databases changed this structure, but only partially. A shared record allowed people to access information directly and act more independently, but usually within procedures that someone else had already designed. For much of the computer era, a relatively small group of managers, operations teams, and engineers defined the company’s schemas, metrics, applications, and workflows – and far more employees used those systems than helped design them.

This constrained not only what people could do, but what the organization could know. For example, a support rep who hears the same complaint several times a week knows something the company doesn’t if her manager doesn’t write up a report that captures it. And fixing the problem is another thing entirely.

The technical barriers to both – knowing and doing – are now falling at once.

As Andrej Karpathy put it in 2023, “The hottest new programming language is English.” Natural-language interfaces allow more domain experts to interrogate a company’s data without waiting for people who know SQL or Python to anticipate or answer every question. At Novo Nordisk, a century-old global healthcare company, scientists used to wait on data engineers to write their queries. Now they ask Genie, “show me all of our obesity data,” and it pulls the relevant trials, insights, and visualizations instantly.

And within defined permissions, employees are empowered to create solutions that save hours or even days of work. At the electric vehicle manufacturer Rivian, a finance analyst with no SQL experience used Genie to build a revenue dashboard for the CFO, and a supply chain analyst built an app to track inbound inventory shipments.

This doesn’t mean everyone has access to all of the firm’s data or resources without approval. Shared ontology, permissions, and accountability become more important as work becomes more distributed. The system of record centralizes state and guardrails while decentralizing who can ask questions, design workflows, and act.

In March, Jack Dorsey wrote a manifesto titled “From Hierarchy to Intelligence” describing how his company Block is beginning to test an extreme version of this idea. “For the first time,” he writes, “a system can maintain a continuously updated model of an entire business and use it to coordinate work in ways that previously required humans relaying information through layers of management.”

Ali’s “system of record for agents” is similar to what Jack calls the “world model” of the company – a continuously updated representation of the organization’s operations, decisions, capabilities, and priorities. People at the edges of the company ground the model in reality, while the model supplies the shared context needed to act. “People reach into places the model can’t go yet.” Dorsey explains. “They sense things the model can’t perceive: intuition, opinionated direction, cultural context, trust dynamics, the feeling in a room. They make the calls the model shouldn’t make on its own, especially ethical decisions, novel situations, and high-stakes moments where the cost of being wrong is existential.” The result is a firm that needs fewer layers of management to coordinate it and gives leaders greater visibility into the work, even as it becomes more distributed.

Databricks already provides some of the underlying infrastructure for Block. It manages and governs petabytes of Block’s data across Square, Cash App, and TIDAL, and Block used Databricks to ground its AI coding assistant, goose, in the company’s context.

For Dorsey, the competitive case for this new architecture is speed. “Companies move fast or slow based on information flow,” he argues. “Hierarchy and middle management impede information flow.”

Ali agrees with Dorsey directionally, but with one distinction. “I agree philosophically with Jack Dorsey,” he says. “The question is does that apply to the org chart of humans too?” People conflate two things, he argues: the org chart and the way information moves through the company. “Ten, twenty years ago, these were the same thing.” The only way to learn what was happening was to ask your people, who asked theirs, up and down the tree – but that’s no longer true. “Genie pretty much answers any question I have in any meeting about anything,” he adds. The firm will still need managers, just fewer information routers. Developing people, helping teams decide what’s important, and noticing when someone is unhappy still require human attention.

So while the two disagree about how much hierarchy will disappear, both see AI taking over the information-routing work that gave managers immense power over the twentieth-century firm, as companies grew too complex to run without them.

The Second Managerial Revolution

Eighty five years ago, on the heels of the Great Depression, James Burnham wrote a book called The Managerial Revolution which foresaw a great change in how businesses worked, and even how capitalism itself worked. Coming out of the Depression, one of the prevailing trendy attitudes was that entrepreneurial capitalism had run its course as an economic trend, and some new system was bound to replace it. Socialist collectives were one trendy proposal at the time, nationalization was another.

Burnham understood what was going on. He articulated a third kind of thing, not just a corporate structure but an entirely new kind of social order, called the “managerial society.” In this system, the decisive ruling class would be neither the traditional capitalist owners nor the workers, but professional managers, planners, bureaucrats, and executives who operate large corporations and states.

Modern institutions, he believed, were too technically complex to be directed personally by individual capitalists. Since no CEO can know everything happening inside a company with a hundred thousand employees, control would gradually migrate from owners and domain experts to administrators.

In the second half of the twentieth century, Managerialism scored a near-complete victory. “Most of the executives at Fortune 500 companies are not domain experts at whatever the company does, and they’re certainly not the founders of those companies,” Marc Andreessen comments. “They’re professional managers, and in fact, over the course of their careers, they’ll probably manage many different kinds of businesses – they might work in healthcare for a while, then financial services, and then they’ll work in something else.”

But that victory is exhausting itself. The scalability and professional reliability of Burnham’s Managerial Class came at the expense of speed and adaptability, particularly in the face of changing technology.

Maybe, Marc suggests, applying agents – on top of a rigorous foundation like Databricks – creates a third model that can offer the best of both worlds. It helps preserve the founder’s vitality and adaptability, while refactoring the managerial work required to scale. Agents will put this way of operating within reach of more founders by automating some of the information routing and coordination work that made the managerial layer necessary, while the firm’s system of record gives the people at the edges the context and authority to act.

Elon Musk takes Marc’s idea a step further. Earlier this year, he predicted that companies with “humans in the loop” will lose. Keeping humans in the loop in the age of AI, he argues, will be like using a spreadsheet that requires a person to calculate some of its cells.

Elon may be right about the eventual destination – nobody knows how far away the fully autonomous company is, and the forecasts range from years to never. But until then, the irony is that the decline of managerialism may look more like everyone becoming a manager. Not everyone will have direct reports, but more people will be specifying work, delegating execution, inspecting results, and updating the process. The second managerial revolution is not so much the death of management as it is the end of the professional managerial class’s monopoly on it.

Software engineers are feeling this acutely today, as the job shifts from artisanally writing code to managing a team of coding agents. An engineer’s day increasingly looks like a manager’s: scope the problem, break it into tasks, delegate them to agents working in parallel, then review the pull requests that come back – approving some and sending others back with notes. As agents become capable across more domains, more knowledge workers will make a similar shift: from performing every step themselves to specifying, delegating, and judging the work. The Novo Nordisk scientists and Rivian supply chain analysts are already directing agents with Genie to do work that used to require a team of engineers or data scientists, freeing those teams to focus on their most strategic work.

This is good news for human productivity and salaries because execution and judgment are economic complements: when AI reduces the cost of routine execution, demand rises for the judgment that directs it.

The mathematician Alfred North Whitehead observed a century ago: “Civilization advances by extending the number of important operations which we can perform without thinking of them.” The firm advances the same way, becoming more autonomous one loop at a time. Every time a person corrects an agentic loop, the correction should improve the next execution. And as a loop proves it can perform a bounded job reliably, the human moves out of it and to the next unsolved problem, leaving what they have learned in the firm’s shared record.

But, as Burnham probably would’ve noticed, for the firm to remain sovereign, it must own its model and everything the people at the edges teach it.

The Sovereign Firm

Great people will be more valuable than ever in the agentic firm. But great people also come and go. Meanwhile, models keep improving, and every competitor can rent the same ones. So how, exactly, does the firm build a sustainable competitive advantage in this new world?

Consider two banks renting the same frontier model to help make credit decisions. The first sends the model a prompt, receives an answer, and records the final decision. The second records which facts produced the answer, any human override, which decisions performed well, which failed, and adjusts its policy throughout. A year later, when a better model arrives, only one of them has built a better bank. If you replace the AI model at your company and the new one inherits your definitions, permissions, evaluated cases, customer history, and hard-won exceptions, that is a foundation for a sustainable competitive advantage. If the new AI model starts from the same prompt as everybody else, that is not.

The second bank is what people have started calling a “sovereign” firm. If a provider raises its prices, changes its terms, or retires a model, the firm can switch providers without losing what it has learned. As the models get smarter and companies grow more dependent on them, that independence only becomes more important.

In a recent essay, Microsoft CEO Satya Nadella reached a similar conclusion for a different reason. AI models continuously absorb the expertise of humans and organizations and commoditize it, he argues, so “every company is going to have to build what I think of as human capital and token capital.” Human capital is the knowledge, judgment, relationships, and ingenuity of a company’s people, and token capital is the AI capability it builds and owns. The two compound in a learning loop, and “this loop becomes the new IP of the firm.”

Data is the foundation of token capital. “Every company’s business data is their gold mine,” Nvidia CEO Jensen Huang told the audience at Databricks’ 2024 Data + AI Summit, explaining that nearly every process at Nvidia starts with a data flywheel, from chip design to supply chain. “It is making it possible for us to be one of the largest, small companies in the world,” he said. At the time, Nvidia was valued at more than $3 trillion with just 30,000 employees. “The reason for that, of course, is that we have so many AIs in the company helping us out, doing amazing things.” Jensen believes this will apply to every company. “It’s an extraordinary time,” he said, “and it starts with data.”

Databricks is betting that data and the loops built on top of it should live in systems the firm controls. That even includes Databricks’ own specialized models, which it has spent years optimizing for enterprise workloads. The important thing is the loop, not just the data; which is where they’ve been focused since 2023, before it was obvious to everyone. Ownership alone is not a moat, but it prevents the firm’s memory from becoming trapped in some vendor’s stack. The moat emerges only when the data and AI that reasons over it help the firm improve its decisions and products faster than competitors can.

Databricks built this muscle early on. Spark was open source, so customers could just download it and run it themselves. But eventually the founders learned that customers would pay for Databricks if they made Spark easier to run, faster, more secure, and more useful for the enterprise. To survive, they had to create value for their customers faster than the free alternative could catch up. And as agents lower the cost of finding and switching to alternatives, more companies will face a similar test.

The Best Idea You’ll Ever Have

About a decade ago, Ali called me for advice. One of the biggest companies in the world had offered to buy Databricks for about six times the valuation of its last funding round.

It seemed like a dream outcome considering that just two years earlier the company had almost died and couldn’t find a lead for its Series C. We led the Series A in 2013, back when the company was seven Berkeley academics whose only recurring revenue was ticket sales to their own conference, and stepped in with NEA to lead the Series C nobody else would.

Ali remembers the conversation better than I do:

“Hey, you can do whatever you want. I’ll support you in either case. And actually, if you sell for this number, it’s really great for me: we make a lot of money at a16z, I’ll pay the investors back many times over. Honestly, for me personally, that’s probably the better option. But I’m just thinking back. I was CEO of Loudcloud and Opsware — the cards I was given at that company weren’t the company you have. And when I look back, how often in life do you have the chance to even have a company like Loudcloud or Opsware, let alone a Databricks? It’s just such a freaking big market. You can sell and make a lot of money, and you’ll be super successful in life. But if you’re like me, you’re going to look back the rest of your life thinking: ‘I missed that one shot. That was the one thing, and I should’ve taken it all the way. And now I’ll never know how far I could’ve taken it.’ So do you want to live with that, or do you want to just have the money? I’ll support whatever you want to do.”

Ali said thanks and hung up. Then he said to himself: “We’re never doing this. It’s not happening.”

You just don’t get this good of a market opportunity with this good of an entrepreneur. That’s the rarest of rare things. We see great entrepreneurs but their market opportunity is limited, and then we see companies that have a great market opportunity but the entrepreneur is not big enough to fulfill that. But this was a case where we had both.

Last month, Databricks crossed a $7 billion revenue run rate, growing 80% year over year, and was valued at $190 billion. The entrepreneur, it turned out, is big enough.

And the TAM is the foundation of the firm itself – a shared system of record that defines what is true, what the data means, who can do what, and what worked. With that foundation in place, people and agents can act autonomously without routing every decision through layers of management, while the results of their actions flow back into a record the firm owns.

Coordination costs will fall, companies will get more done with the people they have, and new companies will get built that never made sense before, because ten people will be able to do what used to take thousands. And until AI can do everything a great person can do – which is a long way off – this will make great people more valuable, not less.

Fewer people will be carrying out procedures someone else designed because agents will handle the work that’s already been figured out. More will work on problems that no one has solved yet – judging what’s good, noticing what’s changed, and deciding what should exist next.

What will people do at work all day in the coming decades? The honest answer is: whatever hasn’t been figured out yet. As agents and the firm automate more of the work we already know how to do, people work with this new intelligence to build amazing new things and solve problems previously out of reach.

Recommended For You
Infra

new Defense in Depth, Rebuilt for Machine Speed

Asaf Ezra and Stephenie Zhang
Infra

new The Exploit Was the Bottleneck

Asaf Ezra and Stephenie Zhang
Growth

new The New Security Agenda

Stephenie Zhang and Owen Colby

Expert News by a16z

We have built a network of experts who are deeply rooted in technology and how it’s shaping our future. Subscribe to our newsletters to receive their perspectives.

Views expressed in “posts” (including podcasts, videos, and social media) are those of the individual a16z personnel quoted therein and are not the views of a16z Capital Management, L.L.C. (“a16z”) or its respective affiliates. a16z Capital Management is an investment adviser registered with the Securities and Exchange Commission. Registration as an investment adviser does not imply any special skill or training. The posts are not directed to any investors or potential investors, and do not constitute an offer to sell — or a solicitation of an offer to buy — any securities, and may not be used or relied upon in evaluating the merits of any investment.

The contents in here — and available on any associated distribution platforms and any public a16z online social media accounts, platforms, and sites (collectively, “content distribution outlets”) — should not be construed as or relied upon in any manner as investment, legal, tax, or other advice. You should consult your own advisers as to legal, business, tax, and other related matters concerning any investment. Any projections, estimates, forecasts, targets, prospects and/or opinions expressed in these materials are subject to change without notice and may differ or be contrary to opinions expressed by others. Any charts provided here or on a16z content distribution outlets are for informational purposes only, and should not be relied upon when making any investment decision. Certain information contained in here has been obtained from third-party sources, including from portfolio companies of funds managed by a16z. While taken from sources believed to be reliable, a16z has not independently verified such information and makes no representations about the enduring accuracy of the information or its appropriateness for a given situation. In addition, posts may include third-party advertisements; a16z has not reviewed such advertisements and does not endorse any advertising content contained therein. All content speaks only as of the date indicated.

Under no circumstances should any posts or other information provided on this website — or on associated content distribution outlets — be construed as an offer soliciting the purchase or sale of any security or interest in any pooled investment vehicle sponsored, discussed, or mentioned by a16z personnel. Nor should it be construed as an offer to provide investment advisory services; an offer to invest in an a16z-managed pooled investment vehicle will be made separately and only by means of the confidential offering documents of the specific pooled investment vehicles — which should be read in their entirety, and only to those who, among other requirements, meet certain qualifications under federal securities laws. Such investors, defined as accredited investors and qualified purchasers, are generally deemed capable of evaluating the merits and risks of prospective investments and financial matters.

There can be no assurances that a16z’s investment objectives will be achieved or investment strategies will be successful. Any investment in a vehicle managed by a16z involves a high degree of risk including the risk that the entire amount invested is lost. Any investments or portfolio companies mentioned, referred to, or described are not representative of all investments in vehicles managed by a16z and there can be no assurance that the investments will be profitable or that other investments made in the future will have similar characteristics or results. A list of investments made by funds managed by a16z is available here: https://a16z.com/investments/. Past results of a16z’s investments, pooled investment vehicles, or investment strategies are not necessarily indicative of future results. Excluded from this list are investments (and certain publicly traded cryptocurrencies/ digital assets) for which the issuer has not provided permission for a16z to disclose publicly. As for its investments in any cryptocurrency or token project, a16z is acting in its own financial interest, not necessarily in the interests of other token holders. a16z has no special role in any of these projects or power over their management. a16z does not undertake to continue to have any involvement in these projects other than as an investor and token holder, and other token holders should not expect that it will or rely on it to have any particular involvement.

With respect to funds managed by a16z that are registered in Japan, a16z will provide to any member of the Japanese public a copy of such documents as are required to be made publicly available pursuant to Article 63 of the Financial Instruments and Exchange Act of Japan. Please contact compliance@a16z.com to request such documents.

For other site terms of use, please go here. Additional important information about a16z, including our Form ADV Part 2A Brochure, is available at the SEC’s website: http://www.adviserinfo.sec.gov.